Maree had already started renovating her 2200mm x 1500mm bathroom when she realised there was more involved than expected. Rather than simply finishing what had been started, she brought in Better Bathrooms Australia to rethink the entire room.
Over five weeks, we completed the renovation with a walk-in shower, custom joinery, concealed plumbing and carefully selected finishes.
Maree had started the renovation herself before deciding it was time to bring in a professional team.
Rather than simply completing the work already underway, she wanted to use the opportunity to rethink the bathroom. The brief was for a warm, practical and well-finished room that made better use of the existing footprint.
We completed the strip-out before meeting with Maree on site to work through the new layout and positions of key fixtures, including the heated towel rail, shower rose and wall mixers.
After exploring several design revisions, we settled on a layout that removed the bath, introduced a walk-in shower and concealed the toilet cistern behind custom joinery.
Once the layout and selections were confirmed, our team managed each stage through to handover. It’s the same considered approach we bring to our bathroom renovations across Sydney, with the layout and selections planned around the room and how the client wants to use it.
You can also see how each stage works on our renovation process page.
At just 3.3m², there was no room for wasted space.
The bath, shower, vanity, toilet and storage all needed to work within a compact footprint, while the lighting had to complement the room without adding visual clutter. Every fixture and plumbing position therefore needed to be considered together rather than in isolation.
Removing the bath gave us the flexibility to introduce a walk-in shower and reorganise the room around the way Maree wanted to use it.
Several design choices then helped keep the finished layout clean and uncluttered:
Together, these choices allowed the walk-in shower, vanity, toilet and storage to work within the compact floor plan without unnecessary visual clutter.
The finishes were kept cohesive so the smaller room didn’t become overloaded with competing materials.
Not much. The finished bathroom achieved the brief and the five-week renovation came together as planned. If we took on a similar compact bathroom, we’d carry forward the same focus on resolving the layout early before locking in the finer design details.
Five weeks after taking over Maree’s half-finished DIY renovation, the bathroom was complete.
The bath had been replaced with a walk-in shower, the toilet cistern was concealed within custom joinery, and the new vanity, lighting and finishes gave the room a cohesive new look.
The result is a warm, practical bathroom that feels considered from the walk-in shower and custom joinery through to the tiles, lighting and finishing details.
5 weeks
Ryde, NSW
Maree
If you’re planning a small bathroom renovation in Ryde, careful layout planning can make a big difference to what you can achieve.
If you’re working with a compact or outdated bathroom, browse more of our bathroom renovation case studies or talk to Better Bathrooms Australia about your space.