The renovation began with careful preparation and planning, followed by the structural, plumbing and electrical work needed to bring Damien and Kate’s new layout to life.
Floor and wall protection, along with dust barriers, were installed before the bathroom was stripped back to the existing wall studs and concrete slab.
The following day, we met with Damien and Kate on site to confirm the positioning of every fixture and fitting. Once the layout was finalised and all materials had arrived, the renovation schedule was ready to go.
Drainage was relocated to suit the new layout, electrical work was upgraded for the new lighting, and false walls were built to house the in-wall toilet cistern. The bowed walls were also battened out to create a flat surface for tiling.
Damien and Kate selected mitred-edge tiling with an epoxy finish, LED lighting, wall sconces and custom stainless steel strip drains to achieve the high-quality finish they wanted.
With the structural and finishing work in place, the bathroom was brought together into the spacious, polished result Damien and Kate had envisioned.
The real test of this project was fitting a bath, a shower, a vanity and a toilet into one room without it feeling crowded, while still keeping that open, free-flowing feel Damien and Kate wanted. The layout that made this work meant relocating the drains, which was more complicated than it sounds: the concrete slab sat around 200mm above the ground, with no clearance to work underneath the house.
Our first option was removing the entire slab to access the plumbing, but the cost started creeping too close to budget for comfort. Instead, we got hands-on and manually dug out the ground beneath the house, just enough to slide in and reroute the drainage ourselves. It wasn’t the easiest way to solve the problem, but it kept the project on budget without compromising on the layout Damien and Kate actually wanted.
With the new layout in place, the finishing details were chosen to give Damien and Kate the custom, high-quality result they wanted.
The finished bathroom delivers exactly what Damien and Kate set out to achieve, combining a spacious layout, practical features and high-quality finishes, even after the project encountered unexpected challenges.
A carefully considered layout gave Damien and Kate the spacious bathroom they wanted, with room for both a bath and shower.
The team delivered the high standard of finishes Damien and Kate wanted, creating a bathroom they’re proud to show off.
Despite unforeseen digging and drainage issues, the team kept the project on schedule and within budget without compromising the finished result.
4 weeks
East Hills, Sydney
Damien and Kate
$39,000.00 inc GST